A Shoreline Alteration Permit is required for any aquatic vegetation removal. With a permit, residents may clear and maintain an access corridor that is 50 feet wide, or 50 percent of the property width, whichever is less. Exotic and nuisance vegetation outside of the access corridor may be removed (with a permit) and replaced with native species. A re-vegetation plan may be required. The Shoreline Permitting Guide (can be downloaded from the link above) contains detailed information and drawings related to planting plans, suggested plant species and plant installation tips. There is no fee associated with the vegetation removal permit. Permits are valid for three years and renewal notices will be sent by the City automatically.
Rip Rap Revetments, Seawalls or Other Shoreline Armoring Activities
All revetments and seawalls must receive a shoreline alteration permit from the Lakes and Waterways Advisory Board prior to commencement of work. The current revetment regulations are summarized below. For projects that involve any structural components (other than fabric and rip-rap installation), a building permit is required before construction may begin.
Hearing Dates
All revetment and seawall applications are reviewed and decided upon by the Lakes & Waterways Advisory Board at their regular monthly meetings. Meetings are held every month on the second Tuesday at noon, at the Public Safety Facility on the second floor in the Ray Beary Community Room, located at 500 N. Virginia Ave. Applicants may attend these meetings, but their presence is not required.
Submittal Deadline
Site plan applications must be received by the Public Works Department by the the second Tuesday of the month, for hearing at the next month’s Lakes Board meeting. Due to notification requirements within the City Code of Ordinances, applications received later than the the second Tuesday of the month will be held for hearing at the next possible meeting.
Current Revetment and Seawall Allowances & Restrictions
Please note that any properties that do not meet the current shoreline vegetation standard (50 feet or 50 percent rule – see details in shoreline vegetation section above), must be revegetated before a shoreline permit will be issued. See the shoreline vegetation permitting section on this page for more details. All shoreline armoring project must meet the following criteria to be considered for approval:
All revetments and seawalls must receive a shoreline alteration permit from the Lakes and Waterways Advisory Board prior to commencement of work. The current revetment regulations are summarized below. For projects that involve any structural components (other than fabric and rip-rap installation), a building permit is required before construction may begin.
Hearing Dates
All revetment and seawall applications are reviewed and decided upon by the Lakes & Waterways Advisory Board at their regular monthly meetings. Meetings are held every month on the second Tuesday at noon, at the Public Safety Facility on the second floor in the Ray Beary Community Room, located at 500 N. Virginia Ave. Applicants may attend these meetings, but their presence is not required.
Submittal Deadline
Site plan applications must be received by the Public Works Department by the the second Tuesday of the month, for hearing at the next month’s Lakes Board meeting. Due to notification requirements within the City Code of Ordinances, applications received later than the the second Tuesday of the month will be held for hearing at the next possible meeting.
Current Revetment and Seawall Allowances & Restrictions
Please note that any properties that do not meet the current shoreline vegetation standard (50 feet or 50 percent rule – see details in shoreline vegetation section above), must be revegetated before a shoreline permit will be issued. See the shoreline vegetation permitting section on this page for more details. All shoreline armoring project must meet the following criteria to be considered for approval:
- The permit fee for any shoreline armoring is $100. If there are structural components that require a building permit, the building permit fee will be charged in addition to the shoreline alteration permit fee.
- Vertical walls not permitted (except on canals)
- Slope may be no steeper than 3:1 (must extend 3 feet horizontally for every 1 foot of height)
- Shoreline must have existing erosion problem
- Must meet vegetation criteria (50 feet, 50 percent rule)
- Some projects may also require a building permit
- All new armoring projects also require a permit from the FDEP (contact at 407-897-4100)